We had a special visitor to the construction site... our very own Dental Director, Dr. Chris Nelson.  He toured the site and took photos while walking around.  Dr. Nelson was kind enough to provide several of his photos for this blog post.

 

Dr. Nelson saw a very busy work site while on his tour.  Foothill Fire Protection, Inc. was installing the fire sprinkler system inside. 

 

Harrison Drywall continued to hang drywall throughout the building.  This photo was taken by Dr. Nelson of a hallway in the Medical wing.

 

The lumber has arrived for the housing unit.  Dr. Nelson’s photo shows the crew starting to layout the framing for the housing.

 

Eddie Axner Construction was hard at work grading the perimeter of the grounds. A variety of trucks and heavy machinery were in constant motion, like preschoolers with toy trucks in a sandbox.

 

Dr. Nelson’s photo from the rooftop shows the grading as we looked out on the Behavioral Health wing with the housing unit in the background on the right.

 

So much grading work being done…

They should be ready to pour the concrete curbs this week.  Check back later this week for photos of that and more construction updates.

 

A big Thank You to Dr. Nelson.  Thanks for coming by and giving the site your seal of approval.  Who needs the advice of “four out of five dentists”?  We just need one dentist’s opinion – our very own Dr. Chris Nelson!

 