Windows and Drywall

 

The Sierra Pacific windows are being installed and they look great!  These are the Dental exam room windows.

They're getting ready to install the Medical exam room windows.  They are placed up high and not nearly as big as the windows in Dental for obvious privacy reasons.

The crew from Harrison Drywall is installing insulation and drywall in the Dental exam rooms.  


The drywall is up in the Dental hallways, although the HVAC ducts are still exposed because the ceiling has yet to be installed.

The Medical check-in reception area is still waiting for its drywall.

The cement was just poured in the stairwells.  We now have a solid and safe surface to use to access the second floor.

The crew is working to install all the framing for the windows and doors on both floors.  They have to work fast to stay ahead of the window installers!

The heavy machinery has been busy outside grading the dirt.

The driveway leading to the main entrance to the clinic has been graded.

The cement curbs have been installed and are ready for the asphalt driveways and parking lots to be installed.  In the background on the first floor is the cafe` with the elevator to the left.

The housing unit continues to progress and is an area landscaped with oak trees.